The WARM difference
Working closely with the Passivhaus Designer, WARM paid particular attention to the way in which the insulation had been installed to the walls and roofs, insisting on detailed quality assurance checking by the team.
The innovative approach to hiding ventilation terminals was probed for effectiveness, ensuring good air quality in the building.
Awards
- 2024 – Cambridge Forum for the Construction Industry: The David Mackay Award for Engineering and Sustainability: Commendation
- 2023 – Housing Design Award
- 2023 – AJ Architecture Award – Housing (£5m – £20m)
Project information
- Passivhaus Classic standard: pending certification
- 84 homes, of a mixture of shared, couples and family accommodation, split across 4 buildings.
- Treated floor area: 3,362 m2
- WARM project lead: Liam McDonagh-Greaves